Monday 10 January 2011

Time Planning

Me and Emma have sat down together and roughly planned out our filming schedule to give ourselves and our actors enough notice to be available and to fully understand what we need to get done. Although these are liable to change due to availability of equipment and also possible absences of cast members:

Filming: Indoor Shots 1 - Saturday 7th January 2011
5.30 pm onwards
Potential problems: Camera Availability (busy time)

1. Bedroom Shots (Total of 11 shots = 44 takes)
Location: Milly's House
Estimated time: 1 Hour 30 Minutes (20 minutes set up, due to changes in location around the house and changes in camera angles, 1 hour filming, doing 4 takes of each shot, lighting check, 5 minutes test shots) Cast required: Vince, Sam and Milly

Filming: Indoor Shots 2 - Tuesday 9th January 2011
10.10am - 11.10am
Potential problems: Studio Availability

1. 'Photobooth' Shots (Total of 4 shots = 16 takes)
Location: Worcester Sixth Form College, photography studio
Estimated time: 30 minutes (5 minutes set up, 5 minutes lighting check, 20 minutes filming) Cast required: Vince and Milly

2. Head and shoulders 'miming' shots (Total of 5 shots = 20 takes)
Location: Worcester Sixth Form College, photography studio
Estimated time: 15 minutes (set up already done, 15 minutes filming)

Filming: Indoor Shots 3 - Tuesday 9th January 2011
6.30pm onwards
Potential problems: Public place, ease to film

1. Jump Cuts - Two Shots (Total of 13 shots = 39 takes)
Location: The Firefly, Worcester
Estimated time: 1 hour (5 minutes set up, 5 minutes lighting check, half an hour filming, allow 20 minutes for interruptions from people in a public place)

Filming: Outdoor Shots 1 - Wednesday 10th January
12.30pm
Potential problems: Unsuitable weather conditions

1. Hill shots, mime's running towards camera (Total of 3 shots = 12 takes)
Location: Rebecca Gardens, Worcester
Estimated time: 30 minutes (10 minutes set up and lighting check, 5 minutes test shots, 15 minutes filming, doing 4 takes of each shot) Cast required: Vince and Milly

2. Café Rouge shots, mime's at table (Total of 9 shots = 36 takes)
Location: Café Rouge, Worcester
Estimated time: 1 Hour (15 minutes set up due to changes in camera angles, lighting check, 5 minutes test shots, 40 minutes filming, doing 4 takes of each shot) Cast required: Vince and Milly

3. Bike shots (Total of 8 shots = 32 takes)
Location: River Severn, Worcester
Estimated time: 1 Hour (15 minutes set up due to changes in camera angles, lighting check, 5 minutes test shots, 40 minutes filming, doing 4 takes of each shot) Cast required: Vince and Milly

1. Point of view shots (Total of 5 shots = 20 takes)
Location: Worcester Sixth Form College
Estimated time: 20 minutes (5 minutes set up and lighting check, 10 minutes filming and retakes)

Filming: Indoor Shots 4 - Sunday 14th January 2011
1.00 pm onwards
Potential problems: Cast transport to location

1. Sofa Shots (Total of 18 shots = 72 takes)
Location: Leah's House, Worcester
Estimated time: 1 hour (15 minutes set up due to changes in camera angle, 5 minutes lighting check, 40 minutes filming)

Photography: Stop Motion Animation - Friday 8th January 2011
5.00pm onwards
No potential problems

1. Stop Motion animation of inanimate objects (accordion, back of cards, socks, gloves)
Location: Emma's House, Droitwich
Estimated time: 30 minutes (5 minutes set up and 25 minutes taking various pictures)

No comments:

Post a Comment